Our Process

How Pool Removal Works

From your first call to the final walkthrough, we handle every step. No surprises, no hidden fees, just a clean yard ready for whatever comes next.

01

Free Site Assessment

We visit your property, evaluate access, pool type, depth, and surrounding conditions. You get a firm written estimate with no obligation.

02

Permits & Scheduling

We pull all necessary demolition permits and coordinate utility disconnects. You pick a start date that works for your schedule.

03

Draining & Demolition

We drain the pool and break up the shell, removing everything per the agreed method — engineered or non-engineered — with all debris loaded for haul-off.

04

Debris Hauling

All concrete, rebar and debris are loaded and hauled away if we are doing a full removal. We leave the site clean and ready for the next phase.

05

Backfill & Compaction

We backfill in 6″–12″ lifts with the soil, wetting down each lift. Every layer is compacted using specialized equipment before the next is added. For engineered pool removals, a soils engineer performs periodic inspections and compaction testing. Upon completion, the engineer issues a compaction report presented to the local building official at the final inspection.

06

Final Walkthrough

We walk the site together, confirm everything meets your expectations, and provide your permit, inspection card, and final compaction report with testing results, when applicable.